10,000 SF swimming facility located at The Paris – 752 West End Ave, designed by BP Architects
The renovation included new pool, changing rooms and bleachers. The renovation included a new MEP systems that takes into account cooling and moisture loads of a swimming pool’s seasonal variations in outdoor air temperature and humidity, solar gains and losses as well as the presence of spectators and bleacher areas.